Project Management

National rollouts, delivered site by site without drama.

Surveys, designs, engineers, deliveries, landlords, opening dates — a multi-site programme is a hundred small projects pretending to be one. We coordinate all of it, and you deal with one person. Our founder's largest programme to date: over 200 quick-service restaurant locations, delivered over 18 months.

Engineer coordinating a multi-site rollout on site

One team owns the whole programme.

Multi-site programmes

Estate-wide upgrades — WiFi, switching, cabling, EPOS — sequenced so every site gets the same tested build and nobody's left half-migrated.

National rollouts

New store and venue openings, refits and platform migrations across the UK, scheduled around each site's trading calendar and fit-out programme.

Coordination and delivery

Surveys booked, kit staged, engineers scheduled, site contacts briefed, escalations handled. You get a plan, a single point of contact and a weekly truth-telling report.

Sign-off and documentation

Every site closes with validation evidence and as-built documentation. At programme end you hold a complete, accurate record of your estate.

Engineers who manage, not managers who forward emails.

Rollouts fail in the gaps — between the surveyor and the installer, the design and the fit-out, head office and site 47.

Because Simplinet does the surveying, design and installation in-house, our project management closes those gaps instead of administrating them. When a site throws a surprise, the person managing your programme understands the engineering well enough to fix it on the spot.

Engineer signing off a site on a tablet during a rollout

How a programme runs

From pilot to programme close.

  1. 1

    Pilot

    One site, surveyed, built and validated. The pilot becomes the template.

  2. 2

    Plan

    Site schedule built around trading calendars, fit-outs and lead times.

  3. 3

    Roll out

    Staged kit, repeatable installs, per-site validation and sign-off.

  4. 4

    Close

    Full estate documentation, snag resolution, support handover.

Frequently asked questions

What size programme do you handle?

From five sites to national estates — our founder has delivered a programme of more than 200 locations over 18 months. The process is the same; only the schedule changes.

Can you work alongside our fit-out contractors?

Yes — we routinely coordinate with shopfitters, M&E and EPOS software vendors, and we'd rather be in the programme early than patching around it late.

Do you cover the whole UK?

Yes, UK-wide, from our Milton Keynes base.

What reporting do we get?

A weekly programme report: sites completed, sites at risk, blockers and decisions needed. Honest, short, and the same format every week.

Planning a rollout?

Talk to us before the programme is fixed — the earlier the engineering is in the plan, the cheaper the plan is.

Call Book a survey